318. The construction of a temporary road is eligible for a declaration of compliance on the following conditions:(1) the work is not carried out in a pond or an open peat bog;
(2) the road surface is not made watertight;
(3) no ditch is laid out;
(4) the total cumulative width of the roadway and shoulders does not exceed 6.5 m;
(5) the right of way for the road is no more than 15 m wide;
(6) when it is carried out in the littoral zone, it is required to carry out an activity associated with an activity eligible for a declaration of compliance or exempted.